Pfeiffer Culvert Replacement

This project removed a 20-ft. long, 4.5-ft. diameter steel culvert and replaced it with a 50-ft. long, 14-ft. wide modular steel bridge. Funded by the Family Forest Fish Passage Program, administered by the Recreation and Conservation Office, the project was completed in November 2019.

BEFORE — the 20-foot long culvert before replacement

 

Thank you for your upload.