South Fork Toutle Headwaters Design Phase 2

The South Fork Toutle Headwaters Design (STHD) project is restoring river and floodplain habitat in the headwaters valley of the South Fork Toutle River in Cowlitz County, Washington.

LCFEG has worked with landowners Washington DNR and Weyerhaeuser for nearly two decades on a watershed-scale restoration plan for this upper anadromous zone, which supports ESA-listed Lower Columbia Chinook, coho, and steelhead. In summer 2026, LCFEG completed most of STHD Phase 2 (PRISM #24-1452), restoring 2.8 miles of stream and 108 acres of floodplain with large wood and riparian planting.

The work spanned the SF Toutle River, Loch Creek, and Trouble Creek. It included floodplain-wide wood loading across the main channel and side channels, plus channel reconfiguration on Loch Creek, and was designed to create over 500 pools. Crews also planted 60 acres and removed scotch broom from 110 acres of the valley floor.

Phase 2 brings LCFEG’s total in the South Fork to 7.3 stream miles and 295 acres. STHD aims to spread Chinook across more of the watershed and make the upper anadromous zone more resilient to a changing climate. LCFEG is now seeking Targeted Investment funding to build Phase 3.

Thank you for your upload.